Circor Pipeline Engineering delivers fast turnaround  

ร้านซ่อมเครื่องวัดความดันโลหิต and flow management know-how agency Circor Pipeline Engineering has equipped a buyer with a rapid opening closure (ROC) for a 48-in gasoline filter vessel inside 10 weeks.
A ROC offers a fast opening access level to pipelines or pressure vessels, for the set up or removal of kit.
Built by Pipeline Engineering in Catterick, UK, the 48-in ASME U-Stamp massive ROC closure needed to be delivered to the shopper in Houston, Texas in 10 weeks. It was built and delivered on time using the new massive Vertical Turning Center (VTC) put in in Catterick in 2020 to reduce manufacturing lead time.
Following the delivery, Pipeline Engineering supplied assist with set up and welding from its Houston facility.
The closure has been geared up with the new CIRCORSmart tag for traceability, document access and simple customer help when it goes into operation.
Share

Leave a Comment